Demotech, design for self reliance


Search for

All Designs

Print this manual.

On this page you can find an explanation on the construction of some of our designs. We're currently in the process of constructing and digitalizing more of our manuals. If you do not encounter the information you are searching for please contact us.

Translate
Copyright & Open Source

Creative Commons License
This work is licensed under a Creative Commons Attribution-Share Alike 3.0 License.

Please refer to our work and provide us with usefull feedback and comments on our design initiatives.

Liability clause

We cannot be held accountable for injuries incurred during construction or usage of our designs and construction manuals.

Back to Construction manual for the Bathroom Toilet unit

7. Or prepare for a temporary pit top construction that can be moved when the pit is full

If composting human excreta is not pracital or acceptable for the future users, the Bathroom/Toilet can be assembled over a deep pit. For the construction of the structure above the pit view the chapter "Temporary pit top construction".
Spil water from the Bathroom/Toilet can best be guided to a sink and not directly into the pit. This will reduce stink coming from the pit. Prevent the pit to be dug into groundwater for the same reason. Do not dig a pit close to a water well.

This page is Under Construction